Hometown TV12 Brockville

Information Portal for Brockville & Surrounding Area

Centeen Park Main Pumping Station Public Information Centre to be held on October 3

Brockville – The City of Brockville is advancing a detailed design to replace the existing Main Pumping Station at Centeen Park to mitigate operational constraints and operator safety risks associated with the existing pumping station.

Public consultation is a key component of this Project. A Public Information Centre will be held to review proposed options for the building architecture and solicit feedback from the public on the preferred option.

We want to hear from you!

The Public Information Centre will be held:

  • Date: October 3, 2024
  • Time: 4:00 pm to 7:00 pm (open house)
  • Location: City of Brockville Council Chambers, 1 King Street West, Brockville, ON K6V 7A5

All those interested in the project are urged to attend.

Click here for additional details and contact information for this project.

Subscribe To Our Newsletter with Latest Posts