
Edwardsburgh-Cardinal – A planning and environmental study has begun for Highway 401 through Edwardsburgh-Cardinal.
The study will examine the Shanly Road Underpass, potential interchange improvements, and the highway’s requirements for a future six-lane section from 1 km east of Highway 16 to 2.5 km east of Shanly Road, spanning approximately 10.1 km.
The study is to identify a Recommended Plan that addresses current and future needs for the provincial highway network. This study will include reviewing existing conditions, developing and evaluating alternatives, identifying appropriate improvements, and developing environmental protection/mitigation measures.
A Recommended Plan will be confirmed and designated (protected) after the study. The Study area falls within the Township of Edwardsburgh/Cardinal, United County of Leeds & & Greenville, as shown in the key plan.
Learn more or join the mailing list at: www.Highway401-Cardinal.ca



More Stories
Scheduled Work Begins This Week, Part of Ongoing Improvements on Brockville Railway Tunnel Lighting
OPP Golden Helmets Performing in Prescott This Saturday, June 6th
The 2026 Shriners Street Fair Begins This Thursday, June 4th running until June 7th in Brockville